Projects
:
In
Saudi Arabia
(RCS):
1-
Renewal of 65 Km on the line between Dammam and Riyadh
,
including welding, and change of sleepers and new rails. Work commenced on
October 1995 and was finalized on 15/12/1997.
2-
Renewal of 72 Km, the line between Dammam and Riyadh
including welding and change of
sleepers and new rails. Work commenced on February 1998 and finalized in
2000.
3- Renewal of 36 Km, the line between Dammam
and Riyadh
including welding and change of sleepers and new rails.
4- Construction
of new 22 km between siding 6 and 9 including the supply of the
materials required. Work commenced in May 2006 and
was finalized in 30/12/2006.
In
Libya
(B.E.C.):
Supplying of
the materials required for the Khoms port connection (pilot and pioneer
railway project in
Libya
). Work commenced in January 2003 and was finalized in September 2003.
Laying the
track between Khoms port and Wadi Keam (site of railway marshalling yard)
totally 51 km. Work will commence in September 2007 for a period of 10
months.
|