Metal Recovery and Slag Processing Co. - S.A.E. (SEPSCO) 3:

:

4-DRI & HBI HANDLING :

-Unloading, piling and loading on trucks to be transported to conveyor belts.

-Cleaning the roads of falling D.R.I or H.B.I

:

5-SPARE PARTS AND WASTE HANDLING:

-Includes transporting of the Waste Refractories, all waste material in the cooling chamber under the electric arc furnace, and also the waste under the silos of the dust collection system, to the specified waste area outside the plant.  This should be at a distance of not more than one kilometer from the plant.

 

:

6-METAL RECOVERY,TUNDISH & EMERGENCY SKULLS BREAKING:

-Loading the tundish skulls and emergency skulls from the melt shop and transferring them to the cutting and metal recovery area, where they will be unloaded.

-Cutting by oxygen lance or breaking by drop balling of:Tundish Skulls, Emergency Skulls and Ladle Skulls.